
Leave Naples in spring. Come home to it finished.
Your condo or second home, designed with you while you are here for season and built while you are up north, by the team that won two 2026 Sand Dollar Awards.
When should you start a Naples condo renovation? Now.
Most Naples and Marco Island associations allow major construction only in the off-season, roughly May through October, on weekdays. In the City of Naples, every project in a multi-family building also needs an approval letter from the association before the permit. So the summer you want is decided in winter. Huffmans Construction Group designs with you while you are in town, so the build starts the day your window opens.
- Nov to Feb · You are hereDesign & selectionsLayouts, finishes and a line-item proposal while the building is in season.
- Feb to Apr · You are hereBoard packageDrawings, product list, license and insurance certificates, deposits.
- May to Oct · You are up northBuild windowElevator reserved and padded, halls protected, debris out on schedule.
- Before season · You are backWalkthroughPunch list closed and the unit ready when you return.
Building rules vary, and we confirm yours before scheduling. Sources: City of Naples Multi-Family Alteration checklist · Naples HOA remodel windows
Finished, and waiting for their owners.

Living room, walnut built-ins
Walnut shelving framing a linear fireplace, wide-plank oak floors and a deep sectional.

Living room, lit shelving
Backlit floating shelves on both sides of a linear fireplace, with soft blue seating made for season.

Kitchen, blue island
Paneled refrigeration, white cabinetry to the ceiling and a deep blue island.

Kitchen, stone island
A veined stone island with seating, white shaker cabinetry and a patterned backsplash.

Primary bath, freestanding tub
A freestanding tub under plantation shutters and a stone-topped vanity with a makeup station.

Home office, arched windows
Deep blue walls, arched windows and a desk set up for the days you work from Naples.
The three answers seasonal owners want before they leave.
One project manager, and the owner on site.
Every project has one project manager and one written schedule, and John Huffman, the licensee, still walks every job. If a detail is not right, the team comes back and fixes it.
We build the board package for you.
In the City of Naples, all work in a multi-family building needs an approval letter from the association. Huffmans prepares the drawings, product list, license and insurance certificates your board asks for.
Source: City of Naples Multi-Family Alteration checklistA fixed price before you leave.
Design and selections end in a line-item proposal, and your fixed price comes after an in-home walkthrough, scheduled while you are in town. No open-ended estimate follows you north.
Award-winning work, independently verified.
The Collier Building Industry Association judges the Sand Dollar Awards each year. Every credential below links to the organization that issued it.
Collier Building Industry Association36th Annual Sand Dollar Awards
September 19, 2026
- Winner · $750,001 to $1,000,000Whole House RemodelQuail West, Sorrel Way
- Winner · $1,000,001 to $3,000,000Best Master SuitePrivate Residence · Quail West, Sorrel Way


What does a second-home renovation cost in Naples in 2026?
A full Naples condo renovation typically runs $60,000 to $150,000, and a down-to-the-slab gut runs $150,000 to $300,000 or more. A whole-home refresh with finishes, kitchen and baths starts around $250,000 to $400,000. Huffmans Construction Group, a two-time 2026 Sand Dollar Award winner, gives a fixed price after an in-home walkthrough, scheduled while you are in town. For condo kitchens and baths, see the full condo cost guide.
Ranges come from published 2026 Naples and Southwest Florida contractor cost guides, listed below. Your fixed price comes after an in-home walkthrough.| RefreshNew cabinets and counters, same layout | $30K–$65K |
|---|---|
| Full remodelSemi-custom cabinets, quartz, some layout change | $55K–$90K |
| LuxuryCustom cabinetry, quartzite, panel-ready appliances | $100K–$175K+ |
| Full remodelGut of a primary or large guest bath | $20K–$42K |
|---|---|
| High-end suiteCurbless shower, custom vanity, stone | $45K–$90K+ |
| Luxury, within a larger remodelPrimary suite as part of a whole-home job | $60K–$150K |
| Full unitKitchen, baths, flooring, finishes | $60K–$150K |
|---|---|
| Down to the slabFull gut including plumbing and electrical | $150K–$300K+ |
| Luxury condoHigh-rise, custom throughout | $100K–$500K+ |
| RefreshFinishes, kitchen and baths, layout kept | $250K–$400K |
|---|---|
| Full interior gutNew layout, systems, finishes | $400K–$800K |
| StructuralWalls, additions, engineering | $800K–$1.5M+ |
Sources, 2026 unless noted: Alliance Construction kitchen guide · Alliance Construction bathroom guide · Cutting Edge · XL Homes of SWFL · GC Pro West · Titan Builder. Market ranges, not a quote.
One contract, from the first sketch to the last punch-list item.

Whole-condo renovation
Kitchen, baths, flooring and finishes in one schedule, built inside your building's work window.

Kitchens
Custom cabinetry, stone islands and appliances, selected with you during design.

Primary baths
Curbless showers, custom vanities and stone, the room you will use every morning of season.

Whole-home renovation
Finishes, kitchen and baths, or a full interior gut, for second homes on land.
Board package
Drawings, product list, license and insurance certificates.
Building logistics
Elevator reserved and padded, halls protected, debris out on schedule.
Walkthrough before season
Punch list closed and the unit ready when you return.
Rated 5.0 wherever clients review us.
“He never accepted ‘it’s ok’, he always worked on details until things were perfect.”
“Despite numerous … change orders, they completed the job on time as promised.”
“John, the owner, was easy to do business with and stuck to the budget quoted.”
“The remodel was impressive, and the quality of their work speaks for itself.”
What has to happen before the first hammer swings.
Association approval letter
In the City of Naples, all work in a multi-family building requires an approval letter from the HOA, and it is part of the permit submittal.
Source: City of Naples checklistSigned, sealed drawings
The permit set includes architectural, mechanical, electrical and plumbing plans, with existing and proposed floor plans and the work areas clouded.
Source: City of Naples checklistSite management plan
A Construction Site Management Form and Plan and a detailed scope of work letter go in with the permit application.
Source: City of Naples checklistWindows near the beach
Replacement windows and sliders need product approvals and design pressures, and glass within sight of the beach needs visual transmittance specs.
Source: City of Naples checklistSeasonal renovations, answered.
How do I renovate my Naples condo while I live up north?+
Plan it while you are in town and build it while you are away. Huffmans Construction Group handles design and selections in winter, prepares the board package for your association in early spring, and builds during the May to October work window most Naples associations allow, with a walkthrough before you return for season.
Why do Naples condo renovations happen in the summer?+
Because the summer is usually the only time a building allows it. Most Naples and Marco Island associations allow major construction only in the off-season, roughly May through October, on weekdays, which is when seasonal owners are away. Huffmans Construction Group confirms your building's window and work hours before scheduling.
When should I start planning a summer condo renovation in Naples?+
Start in November through February. Design, selections and a line-item proposal come first, then the board package in February through April, so construction can begin as soon as your building's summer window opens.
When should I submit my board package for a summer renovation?+
Plan to submit in February through April. In the City of Naples, the HOA approval letter is part of the permit submittal, so board approval has to come before the permit and the permit before the summer start. Huffmans Construction Group prepares the drawings, product list and license and insurance certificates your board asks for.
What does a turnkey remodel include?+
A turnkey remodel with Huffmans Construction Group covers design and selections, a fixed line-item proposal, the board package, permits, construction on a written schedule and a final walkthrough, under one contract with one project manager.
Can I get a fixed price before I leave Naples for the summer?+
Yes. Huffmans Construction Group schedules the in-home walkthrough while you are in town and gives a fixed price from a line-item proposal, so the budget is settled before you fly north. For a full Naples condo, 2026 cost guides put most projects at $60,000 to $150,000. See the full condo renovation cost breakdown.
How much does it cost to renovate a second home in Naples?+
A whole-home refresh with finishes, kitchen and baths typically runs $250,000 to $400,000, a full interior gut $400,000 to $800,000, and structural work $800,000 to $1.5 million or more, according to 2026 Naples cost guides.
Is Huffmans Construction Group licensed and insured?+
Yes. John T. Huffman holds Florida Certified General Contractor license CGC1528960, listed as current and active by the Florida DBPR. The company carries general liability and workers compensation insurance, holds an A+ rating with the Better Business Bureau, and can send insurance certificates to your association.
What awards has Huffmans Construction Group won?+
Huffmans Construction Group won two 2026 Sand Dollar Awards from the Collier Building Industry Association: Whole House Remodel ($750,001 to $1,000,000) and Best Master Suite ($1,000,001 to $3,000,000), both for a Quail West residence on Sorrel Way. It also won Best of Houzz Service in 2016 and 2017.
Second homes across Naples.

